Example Knob and Tube Projects in Everett

Each example walks through what we find in an older home, how our crew handles the wiring, how long the job takes, and an approximate cost. Nearly 1 in 5 Everett homes were built before 1940, so most examples cover houses from that era, while two feature 1950s homes with ungrounded cloth-covered cable rather than knob-and-tube.

Attic wiring check before blown-in insulation

Example project

Knob-and-tube wires on white porcelain knobs running along dark attic beams, with a bare bulb lit nearby
Home
Early-1900s house in Everett, one and a half stories
Original request
Insulate the attic, and keep the old wiring up there if it is safe to leave
Found
Two live knob-and-tube circuits along the attic timbers, one old run already cut off at both ends, and one loose splice
Work
Full attic inspection of every run, written wiring survey, and state certification once the splice is repaired, with copies for the homeowners and insulation crew
Timeline
About three hours in the attic, with the written survey delivered a few days later
Cost
$520

Scope of work

We trace every wire in the attic back to the breaker panel, mark live and dead runs, inspect the porcelain knobs, tubes, and wire insulation along each length, and deliver a written survey listing every circuit, its condition, and what must be fixed before insulating, followed by written certification to the state once repaired. The splice repair and any rewiring are priced separately.

Project overview

In this example, the owners of an early-1900s Everett home want blown-in attic insulation, and their insulation contractor spots knob-and-tube on the attic timbers and holds off until a licensed electrician evaluates it.

Washington allows loose or rolled insulation around existing knob-and-tube only under strict conditions, including a licensed electrical contractor’s survey and written certification to the state, and spray foam is never allowed. When we inspect the attic, we find two sound live circuits, one dead run already disconnected at both ends, and one loose splice. In our written survey, we document which runs are safe to leave and what needs repair first so we can fix the splice before any insulation goes in.

The goal

The homeowners get a clear written answer on their attic wiring before booking insulation, paying only for the single repair their wiring actually needs.

Process

  1. Before the visit We review the insulation contractor’s proposal so our inspection covers the exact area and material.
  2. In the attic We trace each run back to its circuit, test live lines, and inspect every knob, tube, and wire jacket.
  3. A few days later We send the written survey listing each circuit and the single repair needed first.
  4. Next We repair the loose splice on a follow-up visit and submit written certification to the state so insulation can proceed.

Planning right

  • Ask your insulation contractor which material they plan to install, because spray foam is never allowed around knob-and-tube.
  • Even when an attic inspection turns up problems, you get a clear written list of exactly what needs repair or replacement.
  • Keep the survey and state certification with your home records for future buyers or electricians.
  • If most attic circuits fail inspection, replacing them while the attic is clear costs less than coming back later.

Get a free quoteMore about rewiring before attic insulation

Attic wiring replaced after it was found under old insulation

Example project

White-painted basement wall with a gray breaker panel, metal conduits rising into the joists and a small window
Home
1920s one-story house in Everett with a full basement, about 1,100 sq ft
Original request
Add attic insulation, which the insulation contractor will not do over the old wiring
Found
Three live knob-and-tube circuits for the ceiling lights, buried under loose fill an earlier owner blew in with no survey on record; the panel and outlets were redone from the basement years ago
Work
Three attic circuits replaced with grounded cable run up from the basement panel, with the old attic runs removed
Timeline
Old fill cleared by the insulation crew, four days of wiring, the city inspection, then new insulation
Cost
$6,900

Scope of work

After the insulation crew clears the old fill, we trace and disconnect the three knob-and-tube circuits, run new grounded cable from the basement panel up an interior wall into the attic, connect each ceiling fixture and switch drop, pull the old runs out of the attic, and complete the City of Everett permit and inspection. Removing and reinstalling insulation is priced separately by the insulation contractor.

Project overview

In this example, a 1920s Everett homeowner schedules an attic insulation top-up. When the insulation crew pulls back the old loose fill, they uncover live knob-and-tube buried years earlier with no electrical survey on record. Although the panel and wall outlets were updated from the basement in the past, the ceiling lights and switches still run through the attic on old wire.

Under Washington rules, insulation may surround knob-and-tube only after a licensed contractor inspects and certifies it to the state in writing. Because knob-and-tube was designed to cool in open air, wire buried for years can grow brittle or heat-damaged out of sight. We have the old fill removed, replace all three attic circuits, and pass inspection before new insulation goes down.

The goal

The attic is cleared of buried knob-and-tube and inspected before fresh insulation goes in.

Process

  1. Before work We trace the circuits, pull the city electrical permit, and coordinate with the insulation crew to clear the attic.
  2. Day one The insulation crew vacuums out the old loose fill and we disconnect the three old circuits at the panel.
  3. Days two and three We pull new grounded cable from the basement into the attic, wiring each ceiling fixture and switch drop.
  4. Day four We reconnect and test every light and pull the old knob-and-tube wire out of the attic.
  5. Then The City of Everett inspector signs off, clearing the attic for fresh blown-in insulation.

Planning right

  • If loose fill already covers knob-and-tube in your attic, never blow more insulation on top before an electrician inspects it.
  • Wiring buried under old fill can hide heat damage or cracked insulation, which is why replacement is safer than certification here.
  • Schedule your insulation crew for two visits, one to clear old fill and one to reinstall after inspection.
  • Take photos of the new attic wiring runs before insulation covers them so future work goes faster.

Get a free quoteMore about rewiring before attic insulation

Living and dining rooms rewired with the original lights put back

Example project

Gray Craftsman house, two stories, with tapered porch columns on round stone piers, lit windows, shrubs in front and a bay beyond
Home
1920s two-story Craftsman house in Everett, about 1,900 sq ft, lath and plaster throughout
Original request
Put back the original dining room light and four sconces, which an earlier owner took down and stored in the basement
Found
The living and dining rooms still on one knob-and-tube circuit, capped off at the old fixture spots; brittle cloth wire inside the stored fixtures; the rest of the house already rewired
Work
Two new grounded circuits run up from the basement, plus all five original fixtures rewired with new sockets and wire and hung on new boxes
Timeline
Two days of cable routing, a day rebuilding the fixtures on the bench, a day hanging fixtures, then city inspection
Cost
$7,400

Scope of work

We trace and disconnect the remaining knob-and-tube circuit, pull two new grounded circuits up from the basement panel and through the hollow back of the built-in buffet into the living and dining room walls, install new boxes at each original fixture spot, rebuild the dining room light and four sconces with new sockets and wire, add grounded outlets in both rooms, and handle the City of Everett permit and inspection. Plaster patching is priced separately.

Project overview

In this example, the owners of a 1920s Everett Craftsman find the original dining room chandelier and four matching wall sconces boxed in the basement, taken down by a previous owner. They want those fixtures back beside the fireplace and built-in buffet. Most of the house was rewired years earlier, yet these two rooms still share a single knob-and-tube circuit capped at the old fixture spots.

Our scope covers both the wall wiring and the historic fixtures themselves. We rewire every fixture on the bench with fresh sockets and wire, since century-old cloth wire cracks when bent. New grounded cable comes up from the basement, using the hollow back of the built-in buffet so we avoid cutting that dining room plaster wall altogether.

The goal

The original Craftsman light fixtures are safely back on the walls on grounded wiring, leaving no active knob-and-tube anywhere in the home.

Process

  1. First visit We inspect the stored fixtures and trace the old circuit to every outlet and light it feeds.
  2. Days one and two We fish new grounded cable up from the basement into both rooms, routing through the back of the buffet.
  3. Day three We rebuild all five original fixtures on the bench with new sockets and wiring.
  4. Day four We mount the fixtures on new boxes, install grounded outlets, and disconnect the old circuit at the panel.
  5. Inspection The city inspector checks the new basement runs and the fixture boxes before sign-off.

Planning right

  • Show us any vintage fixtures during the initial walk-through so we can price each rebuild accurately.
  • New cable inside the walls never fixes brittle wire inside an antique fixture, so update both together.
  • Built-in buffets and cabinets often have hollow backs that let us route wire without opening finished plaster.
  • Stick to bulbs at or below the wattage rated for each rebuilt socket.

Get a free quoteMore about partial rewiring

A new circuit for a window air conditioner in an upstairs nursery

Example project

Upstairs bedroom with plaster walls, a wood floor, a hatch to the attic in the ceiling and drop cloths folded by the wall
Home
1920s house in Everett, one and a half stories, about 1,600 sq ft, plaster walls
Original request
A safe outlet for a window air conditioner in the upstairs nursery, the hottest room in summer
Found
The room’s two outlets on a knob-and-tube circuit shared with the next bedroom; balloon-framed outside walls open from the basement up
Work
One dedicated grounded circuit for an outlet under the window and a second grounded circuit for the room’s two outlets, both run up from the basement inside the exterior wall
Timeline
Two days of wiring and a city inspection
Cost
$3,900

Scope of work

We pull one dedicated grounded circuit from the panel to a new outlet under the nursery window for the air conditioner, run a second grounded circuit for the room’s two wall outlets up from the basement through the sill and open exterior wall bays, disconnect the nursery outlets from the old shared circuit, and complete the City of Everett permit and inspection. The adjoining bedroom remains on the older circuit for a later phase, and minor box-edge touch-up stays with the homeowners’ painter.

Project overview

In this example, Everett homeowners are preparing a small upstairs bedroom as a nursery, and it turns into the warmest room in the house every summer. They want to run a window air conditioner safely, yet the room’s two outlets share a knob-and-tube circuit with the adjoining bedroom and should not carry a heavy cooling load for hours overnight.

Because the 1920s house is balloon framed, its exterior wall cavities run straight from the basement up to the second floor. We fish both new circuits up from the panel through the sill and inside those open bays, cutting no plaster beyond the outlet boxes themselves and leaving the attic completely undisturbed.

The goal

The nursery stays cool all summer on its own dedicated grounded circuit, with clear documentation of the rooms left for a future phase.

Process

  1. Before work We trace the shared circuit, verify the open exterior wall bays from the basement, and pull the city permit.
  2. Day one We run both new grounded circuits from the breaker panel up through the wall bays into the nursery.
  3. Day two We install the new outlets, disconnect the nursery from the old circuit, and test everything under load.
  4. Inspection The city inspector reviews both new basement runs and checks all three open outlet boxes.

Planning right

  • Give a window air conditioner its own dedicated grounded circuit so it does not overload or trip a shared older line.
  • Never plug a window air conditioner into an extension cord; place the dedicated outlet right beneath the window.
  • Many 1920s homes are balloon framed, so ask us during our visit whether your exterior walls stay open from the basement up.
  • Keep a written note of which adjoining bedrooms still use old wiring so you can tackle them cleanly in a future stage.

Get a free quoteMore about partial rewiring

Bedrooms rewired after an outlet ran warm

Example project

Old cream outlet pulled loose from its metal wall box, wired with braided, cloth-covered cable
Home
1950s single-story house in Mukilteo, over a crawlspace
Original request
Find out why a bedroom outlet felt warm, and fix the wiring behind it
Found
No knob-and-tube; brittle cloth-covered cable with no ground behind three-prong outlets, and a loose connection at the warm one
Work
All circuits for three bedrooms and the hall replaced with grounded cable from the crawlspace and attic
Timeline
Three days of work, followed by the Washington L&I inspection
Cost
$7,900

Scope of work

We trace the bedroom and hall circuits, route new grounded cable from the panel through the crawlspace and down from the attic, install new boxes, grounded outlets, switches, and fixture connections across three bedrooms and the hallway, disconnect the old runs and remove accessible cable, and complete the Washington state permit and inspection. The rest of the home stays outside this scope.

Project overview

In this example, the owners of a 1950s Mukilteo home notice that a bedroom outlet feels warm to the touch. Behind the faceplate, we find brittle cloth-covered cable with a loose splice and no equipment ground, even though an earlier owner installed three-prong outlets.

Rather than knob-and-tube, this home has early 1950s ungrounded cloth-covered cable, which we replace using the same careful routing methods. Because two circuits share all three bedrooms and the hallway, we rewire the whole wing together. In Mukilteo, electrical permits go through Washington L&I, and we pull the permit before starting.

The goal

All three bedrooms and the hallway run on grounded modern circuits, with the warm outlet and brittle cable gone.

Process

  1. First visit We make the warm outlet safe immediately and trace both circuits to every room they power.
  2. Days one and two We pull new grounded cable from the crawlspace and attic into the bedroom and hall walls.
  3. Day three We install all new outlets, switches, and fixture connections and disconnect both old circuits at the panel.
  4. Inspection The state electrical inspector checks the new cable and open device boxes.

Planning right

  • Call an electrician promptly whenever an outlet or switch plate feels warm to the touch.
  • Three-prong outlets do not prove a circuit is grounded; we test each outlet to verify an actual ground path.
  • Have us trace the full circuit behind a troubled outlet, since brittle insulation rarely stops at one box.
  • Keep space heaters off aging ungrounded cloth cable until the circuit is replaced.

Get a free quoteMore about partial rewiring

New kitchen wiring while the walls are open

Example project

Low single-story 1950s house with a wide picture window, a carport on one side and a large lawn in front
Home
1950s single-story house in Marysville with a carport
Original request
Rewire the kitchen during a remodel, before the new drywall goes up
Found
Original cloth-covered cable with no ground, and one outlet circuit shared by the kitchen and the dining room
Work
Old kitchen cable removed, with dedicated grounded circuits for counters, dishwasher, disposal, microwave, and range hood
Timeline
Two days of rough wiring, city rough-in inspection, then one finish day after cabinets are installed
Cost
$6,400

Scope of work

We disconnect and pull out the old kitchen wiring from the open framing, run two dedicated counter circuits with GFCI protection, add separate circuits for the dishwasher, disposal, and microwave plus a range-hood connection, set every box to the final cabinet plan, and handle the City of Marysville electrical permit and inspection. Light fixtures, appliances, drywall, and finishes belong to the main remodel.

Project overview

In this example, Marysville homeowners are remodeling a 1950s kitchen with walls stripped down to bare studs. Inside the framing sits the house’s original ungrounded cloth-covered cable, with a single outlet circuit serving both the kitchen counters and the dining room.

With the framing completely open, we pull new cable cleanly without fishing blind walls. We wire dedicated circuits for the counters, dishwasher, disposal, and microwave, placing every box to match the cabinet drawings. Inside Marysville city limits, the city handles electrical permits and inspects our rough wiring before drywall goes up.

The goal

The remodeled kitchen runs on dedicated grounded circuits, fully inspected before new drywall closes the room.

Process

  1. Before work We review final cabinet drawings and appliance specs and pull the City of Marysville electrical permit.
  2. Days one and two We strip out the old kitchen cable and rough in all new grounded circuits while the framing is open.
  3. Inspection The city inspector approves our rough wiring before insulation and drywall go up.
  4. After cabinets We return for a finish day to trim out outlets, switches, and appliance connections and test every circuit.

Planning right

  • Share final cabinet drawings before rough-in, since moving an outlet box after tile or cabinets go in is costly.
  • Ask us to trace any circuits passing through the kitchen to other rooms, because bare framing is the cheapest time to replace them.
  • Build a buffer day into your remodel schedule between electrical rough inspection and drywall hanging.
  • Rough in wiring for under-cabinet lighting while the walls are open, even if you install fixtures later.

Get a free quoteMore about rewiring during a remodel

Old wiring replaced before a basement is finished

Example project

Corroded fuse box still holding its screw-in fuses, mounted on a stained wall under a bare bulb, with a later breaker panel at its side
Home
1930s house in Snohomish with a basement
Original request
Finish the basement as a family room and laundry, with no old wiring left above the new ceiling
Found
Knob-and-tube along the basement joists for the lights and laundry, still fed from the old fuse box beside the breaker panel
Work
Basement and laundry circuits replaced and expanded, old joist runs removed, and the empty fuse box taken out
Timeline
Four days of wiring, state rough-in approval, city framing inspection, then drywall
Cost
$10,800

Scope of work

We trace and disconnect the old basement circuits, pull the knob-and-tube runs off the exposed joists, wire new grounded circuits for the family room, laundry, and stair lighting into open slots in the existing breaker panel, remove the empty fuse box once nothing remains connected to it, and handle the Washington state electrical permit and inspection. Framing, insulation, drywall, and the city building permit remain part of the basement remodel.

Project overview

In this example, a Snohomish family is turning the unfinished basement of their 1930s home into a family room with a laundry area. The basement lights and laundry still run on knob-and-tube strung across the ceiling joists from an old screw-in fuse box mounted beside a newer breaker panel.

Closing up the ceiling would trap that aging wire overhead, so we remove the old runs while the joists are bare and wire dedicated grounded circuits for the family room, laundry, and stairs into spare breaker slots. Once empty, the old fuse box comes off the wall. In Snohomish, Washington L&I approves our rough wiring before the city framing inspection, so we build both approvals directly into the remodel timeline.

The goal

The finished basement has no knob-and-tube trapped above its ceiling and no legacy fuse box left on the wall.

Process

  1. Before work We trace every circuit leaving the old fuse box and mark outlet and light locations on the framing plan.
  2. Days one to three We disconnect and pull down the old joist wiring and rough in new grounded circuits across the framing.
  3. Day four We land the new circuits in the breaker panel and remove the disconnected fuse box from the wall.
  4. Inspections Washington L&I approves rough wiring first, clearing the way for the city framing inspection.
  5. After drywall We install and test all outlets, switches, and basement lighting fixtures.

Planning right

  • Have us trace everything fed by an old fuse box before work starts; here it served only the basement lights and laundry.
  • Wire the laundry area on dedicated grounded circuits sized for modern washers and dryers.
  • Plan your basement furniture layout early so we place outlet boxes right where you will use them.
  • Keep both the state electrical inspection and city framing inspection on the remodel calendar before scheduling drywall.